Capture-6

Thameslink: Structural Steel – London Bridge

Knowledge Type

Learning Legacy

Organisation

Network Rail Ltd

Major Project

Thameslink Programme
Share this resource:

Thameslink: Structural Steel – London Bridge

Summary

With the steelwork being on the London Bridge project’s critical path, any problems encountered by Bourne Group had a knock-on impact to the rest of the programme, so it was important to keep whole project team happy.

Structural steelwork at London Bridge station included:

– Temporary platform canopies.
– Structural steel in for the retail and ticket office concourse units.

Full Resource