Thameslink: Structural Steel – London Bridge
Summary
With the steelwork being on the London Bridge project’s critical path, any problems encountered by Bourne Group had a knock-on impact to the rest of the programme, so it was important to keep whole project team happy.
Structural steelwork at London Bridge station included:
– Temporary platform canopies.
– Structural steel in for the retail and ticket office concourse units.