Capture-117

Lighting the Olympic Park main arenas

Organisation

Olympic Delivery Authority Philips Lighing

Major Project

London 2012

Author

Mike Simpson - Technical & Design Director, Philips Lighting
Share this resource:

Lighting the Olympic Park main arenas

Summary

Making sure the lighting levels at the three main arenas for the London 2012 Olympic and Paralympic Games reach the formidable demands of television (TV) broadcasting was made even more difficult by the unique challenges that each of them presented. This is the story of how this was achieved in each case.

Full Resource