Crossrail: a Progress Update

Summary

Crossrail is a complex major programme to run new, direct rail services between Reading and Heathrow Airport at the western ends of the railway, to Shenfield in Essex and Abbey Wood in south-east London at the eastern ends. When complete, the railway will be around 73 miles long, stopping at 41 stations, including 10 new stations and 26 miles of new tunnels. Once Crossrail is open, it will become part of Transport for London’s (TfL’s) underground and overground rail network and be known as the Elizabeth line. The Department for Transport (the Department) and TfL are jointly sponsoring the Crossrail programme (the sponsors). Crossrail Ltd is responsible for delivering the programme.

In its 2019 report Completing Crossrail, the NAO found that the funding package stood at £17.6 billion and the forecast cost was £17 billion, with the central section due to open between October 2020 and March 2021. The current funding package agreed in December 2020 is £18.8 billion. This followed announcements in November 2019 and August 2020 that Crossrail required more funding and that the opening date would be delayed. Crossrail Ltd now expects services to run through the central section between January and June 2022. This is 10 to 20 months later than planned when the NAO last reported, and up to three and a half years later than originally planned. Full Elizabeth line services are currently expected to run from May 2023.

Full Resource