Thameslink Systems Engineering
Summary
Activities in the Civil Engineering discipline dominated the delivery of Thameslink Programme’s three key output stages.
This theme captures lessons learned and best practice in systems engineering. As the London Bridge Station Redevelopment draws to a close, more case studies will be captured from all areas of this major project.
In this interview, Michael Thomson, Site Engineer explains some of the technically challenging aspects of building London Bridge station.